DUYEN HAI 2 THERMAL POWER PLANT

  • Owner:
    Janakuasa Vietnam Limited
  • Capacity:
    1320 MW
  • Scope of Work:
    Operation and Maintenance (O&M) of the Ash Handling System (AHS) and Coal Handling System (CHS), Operation and Maintenance (O&M) of the Balance of Plant (BOP) systems.
  • Location:
    Vinh Long
  • Timeline:
    03/2021 - until now

Project Details

Building on these achievements, we will continue to strongly expand our services in operation management, maintenance, repair, and performance improvement not only for coal-fired thermal power plants but also for gas-fired and biomass power plants, creating a stable and sustainable foundation for PESE to achieve even greater breakthroughs in the future.

  • Facebook
  • Twitter
  • Pinterest

Other Thermal Power projects