The BIM 2 solar power plant is located in Phuoc Minh Commune, Thuan Nam District, Ninh Thuan Province, with a designed capacity of 325 MWp. Phase 1 commenced commercial operation in May 2019, and Phase 2 commenced commercial operation in December 2020. The projected annual electricity production for the national grid is 583,792.37 million kWh/year.
The PESE O&M team took over operation and maintenance from April 2023, ensuring continuous and stable plant operation in compliance with state regulations and procedures. PESE guarantees an availability factor (AF) of over 99%.